BT
rss
  • A Fast Story Point Estimation Process

    by Mary Ann Michaels on  Apr 02, 2015

    Estimating story points can be a tedious process. So tedious in fact that some teams abandon doing story points to help predict their velocity. Instead of letting go of this valid way to predict upcoming work, how about finding a way to make the process of estimating points much faster? Not only faster, but FUN! Yes, story point estimation and fun in the same paragraph!

  • The Prioritization Divide: With Numbers or Without?

    by Alex Adamopoulos and Paul Dolman-Darrall on  Nov 19, 2012 1

    While there are many methods that use stories as a means for prioritizing development, there's a basic divide that asks whether it should be done with numbers or without. There are arguments on both sides, but instead of examining these, people tend to fall into one side naturally. Once there, they can become quickly entrenched in the belief that the other camp is foolishly mistaken.

General Feedback
Bugs
Advertising
Editorial
Marketing
InfoQ.com and all content copyright © 2006-2015 C4Media Inc. InfoQ.com hosted at Contegix, the best ISP we've ever worked with.
Privacy policy
BT